One Shenton Way
Construction, Infrastructure, and Building
Project Details
Iconic high value-added complex engineering project involving the fabrication, lifting and installation of 3 steel link bridges of Tower A and B on the 16th/ 17th floor (62m above road level), 24th/ 25th floor (87m above road level) and 33rd/ 34th floor (115m above road level).
-
2 steel crowns: Tower A (150m above road level) and Tower B (225m above road level)
-
Total steel tonnage: 750 tons
-
Project was completed ahead of schedule
-
Received commendation from Hyundai Engineering and Construction
Owner: CDL
Main Contractor: Hyundai Engineering and Construction